C325MD - MDV
PLEASE DO NOT CONNECT AC UNIT CONTROL CABLE TO HA-HB ON INDOOR BOARD - THIS WILL LEAD TO IZONE CPU DAMAGE.
Resetting the indoor unit addressing is mandatory before connecting the iZone controller for 20kW+ units.
Current Firmware Version - 1.3
SERIES & kW | INDOOR | OUTDOOR |
MVi-28.5 kW |
| MVi-280WV2RN1(A) |
Can use RA, Zones, Master or RF as controlling sensor
Polarity is critical see below, for correct connection
For CN9 Indoor Connection
Connection for Three phase systems 20+kW.
Resetting the Unit Addressing on MDV 20Kw+ units
When a MDV AC unit controller is used to do a test run, to put the iZone control system back on and operate the AC, unit addressing needs to be reset. Below is the procedure on how to do it.
1. Power Down the System
Turn off the power to both the indoor and outdoor units.
2. Clear Indoor Unit Addresses
On the outdoor unit control board, locate the S1 DIP switch.
Move DIP switch 2 on S1 to the ON position to clear the indoor unit addressing.
3. Power Cycle the Units
Wait 5 minutes.
Turn the power back on to both the indoor and outdoor units.
Wait another 5 minutes, then turn both units off again.
4. Enable Automatic Addressing
Set the system back to automatic addressing:
Move DIP switch 2 on S1 to the OPPOSITE position (the position opposite of ON).
5. Reconnect the iZone System
Reconnect the iZone system to the indoor unit.
6. Restore Power
Turn the power back on to both indoor and outdoor units and wait 5 minutes.
You can now operate the AC system through iZone.