PAGE CONTENTS
PHOTO & DESCRIPTION
The iZone System Multiplexer allows up to five iZone systems (C225 modules) to be displayed on up to three screens (CCTSL#)
1️⃣ Ports to CCTSL: 3 x RJ45 iZone Net ports for connection of up to three CCTSL screens
Screens connected to a Multiplexer cannot be used as zone or master temperature control sensors
If one CCTSL+ screen is connected to the multiplexer the air quality measured by the CCTSL+ screen will be displayed on all other screens connected to the same multiplexer
2️⃣ Ports to C225 modules: 5 x RJ45 iZone Net ports for connection of up to five C225 modules. Connection of C225 modules must start with CCPU1 port followed by CCPU2 etc
3️⃣ Transformer JST VA connection: Connect the iZone transformer here. Part number CT24ACE
SPECIFICATIONS
Model numbers | CISM, CISMK |
Power supply | 24VAC 50Hz |
Casing material | Fire retardant ABS plastic |
Power connection (Only supplied with CISMK) | Zone transformer CT24ACE |
Operating Temperature | Up to 65oC |
Communications protocols | CAN Bus |
Number of systems | 2-5 |
Number of CCTSL screens | 2-3 |
Cable included - (CISMK only) | CFC1 (CAT5 E) |
O/A Dimensions | Height 32 mm Width 120 mm Length 90 mm |
Weight (Excludes transformer and cable) | 151 g |
INSTALLATION
PREPARTION
1️⃣ Ensure all components have the same firmware version across all iZone systems
If the versions are different, use the highest version on CPU 1
2️⃣ Test all components prior to installation to confirm all components are working as intended
CONFIGURATION
1️⃣ Install each system as a stand-alone system first: This includes all items that need to be paired to each individual system
Check that each system has it’s own unique RF setting
This includes the Wi-Fi bridge, do not pair the bridge when the multiplexer is attached, it will only pair to the first system in CPU 1
2️⃣ Once each system is operating correctly as a stand-alone unit: You can now begin to install the multiplexer
3️⃣ The multiplexer is labelled: CPU 1 / CPU 2 / CPU 3 / CPU 4 / CPU 5
4️⃣ The screen will display all connected units: In the order that you plug them in, starting at CPU 1
5️⃣ The screens have three iZone net ports on the multiplexer to plug into: You can use any port, in any order
6️⃣ The maximum total length for the RJ45 cables is 35 metres: e.g. – Screen to multiplexer to a system
Longer cabling can cause issues and is not recommended
7️⃣ Once all systems and screens have been plugged into the multiplexer: You should hit the reset button on one of the screens and allow the iZone to fully load through the initialisation phase